Thursday, October 29, 2009

Water System Step 3-Pump install, & well hook-up






This project is just about done. I still have to put rock around the cobett waterer, because the livestock will tear that area apart. On Monday Sully Plumbing showed-up to start the last few steps in the process and they finished on Tuesday. The last steps included running pipe and electricity up to the well from the cellar, which will serve as the well house for the pressure tank and the home of all the shut-off valves, installing one last water hydrant, and reworking some issues we have had with our rural water line to the house leaking. There is a lot of exposed earth in a few spots now, because the last bit of pipe installation was open-cut with a backhoe. Next spring, there will be some major smoothing out of earth and some seeding to get cover back on those areas. I am glad this is done and am getting used to actually having water where I use it, or at least very close to where I use it. There are only a few things I regret and that is the loss of several bushes that the guys dug-up in this last stage and that the pressure tank got put in front of the builders signature in the root cellar. It says the builders name and that it was built in September of 1910. Our home dates back to 1868 and the farm has been involved in some level of farming for almost this entire time. When you dig, you turn-up a bid of history's junk quite easily.

No comments:

Post a Comment